Boundary features are structures that separate one property from another. This may include a fence, wall, hedge, ditch or some other feature such as a wire or even a change in the landscape such as the edge of paving.
Boundary features can be a source of conflict, as they may straddle both properties, and there may be dispute about the condition of the boundary feature, its position or responsibility for it. Despite this, there is no specific law defining who owns boundary features. It is sometimes believed that a property owner is always responsible for the boundary features on the left of their property, but there is no legal basis for this.
Property deeds may include agreements about ownership of, or responsibility for, boundaries, although these do not generally give any great detail, and are not always clear or accurate.
Title drawings may include T marks or H marks. In this case, T marks appear on the side of the party responsible for the boundary. H marks (that is, T marks on both sides of the boundary) indicate there is joint responsibility.
However, even where there is such documentation, the position on the ground may have changed, making it unclear where the boundary is now, or who is responsible for a boundary feature. For example, neighbours may have both erected fences within their own property, but then one of them may have taken theirs down – giving the impression that the boundary is now running along the line of the remaining fence.
Other presumptions can be made. For example that fence posts, or wall piers are on the side of the party that is not responsible for it, as the owner is likely to prefer the 'clean' side. This may generally be true, but it need not necessarily be the case.
If a new boundary structure has been erected, it might be presumed that it is within the land of the party that erected it, and that they are responsible for maintaining it.
If the position is not clear, the most sensible course of action is to discuss it with the neighbour and try to reach agreement. It is then possible to draft a boundary agreement with the neighbours so that the position is formalised. It may be necessary to seek the advice of as surveyor that specialises in boundary issues, or to seek legal advice to assist in drafting such an agreement.
If agreement cannot be reached, it is possible to take action in the courts, although this is not advisable.
NB: The Party Wall etc. Act 1996 grants the owner of a property the legal right to undertake certain works that might otherwise constitute trespass or nuisance, and protects the interests of adjoining owners from potentially adverse effects of such works. For more information see: Party Wall Act.
[edit] Related articles on Designing Buildings
- Adjoining buildings definition.
- Adjoining owner.
- Basement excavation.
- BREEAM Hard landscaping and boundary protection.
- Building an extension.
- Building boundary.
- Curtilage.
- Derogation from grant.
- Fence.
- Line of junction notice.
- Neighbour dispute.
- Palisade.
- Party Wall Act.
- Party wall surveyor.
- Preventing wall collapse.
- Right of support.
- Site of a building.
- Statutory approvals.
- Statutory authorities.
- Trespass.
- Wall types.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February